Warren D. Hunt Elementary School
banner

banner

 
12.15.2017 A look into one of our future classrooms12.15.2017 Another view of the addition from the hallway (classrooms are on the left)12.15.2017 Contractor discussing the vapor barrier with the team12.15.2017 Our Educational Planner and Chief Operations Officer checking out the construction work12.15.2017 Our Quality Assurance Manager reviewing some electrical box placements12.15.2017 The view from the addition looking through the courtyard at the existing school

12.15.2017 A look into one of our future classrooms

12.15.2017 Another view of the addition from the hallway (classrooms are on the left)

12.15.2017 Contractor discussing the vapor barrier with the team

12.15.2017 Our Educational Planner and Chief Operations Officer checking out the construction work

12.15.2017 Our Quality Assurance Manager reviewing some electrical box placements

12.15.2017 The view from the addition looking through the courtyard at the existing school

 
news and updates

September 4, 2018: Ribbon cutting ceremony officially opens Hunt addition
July 24th, 2018:
Andy Johnson (contractor) is on site patching walls. Interior painting will be happening very soon. Power and AV have been pulled in the classrooms.
July 17th, 2018:
The new chiller is installed. It will be plumbed this weekend and the next. The fiber and racks are being set up. Teacher technology training is coming up in August.
July 3rd, 2018:
The rubber playground surfacing is about half installed and they finished putting gravel in the kindergarten play area this morning.
June 26th, 2018:
All technology has been purchased and is on site being installed. 
June 12th, 2018:
Our project manager and Director of Educational Planning met with staff on Monday. The dedication will be in early September. The furniture has all been installed.
June 5th, 2018:
Classroom technology and furniture installation will begin soon. 
May 29th, 2018:
Hunt is currently in the commissioning phase
May 15th, 2018:
We have our temporary certificate of occupancy! We just had an air barrier test and we're waiting on the results. Commissioning starts this week.
April 24th, 2018:
We're installing carpet later this week and the ceiling tiles will also go in soon. We're hoping to get our temporary certificate of occupancy next week. We will have an air barrier test the second week of May.
March 27th, 2018:
We are working on planning for the new technology that will be in the addition and existing buildings.
March 6th, 2018:
Finishes are going in and most of the plumbing rough-in is done. All of the electrical rough-in is done and we're most of the way done with the plumbing rough-in. The paving for the play court will likely be happening in late March.
February 27th, 2018: We are getting close to approving the graphics package that will be done this summer. We also reviewed the interior painting. 
February 26th, 2018: Hunt Elementary prepars to open 12 classroom addition this fall
February 20th, 2018:
The sheet rock and insulation are continuing to be installed. 
February 13th, 2018: We have been monitoring the moisture levels closely. We are happy to report that the moisture levels are way below the 18% required (under 15% in most cases). That being said, we are rapidly insulating and installing gyp board! The shingles are just about done on the roof as well.
January 2018: The roof and mezzanine are being framed in. 
December 2017: The team is working on the planning for interior murals in the building. There is a committee that includes students helping to develop the concept.
November 2017: Exterior walls have been framed! The fire main is done, tested, and approved. We also shut off the old waterline to cap the new one. Paving is scheduled for next month.
October 2017: Footings were poured and stem walls were put in. Digging for fire/water lines was completed and tested. We also completed paving of the bus loop.
Project Details and Specifications

Hunt elementary infographic